<.<Segmint said:Even if you use Kaysakado's method, you'd still have to create different sectors within the conveyor belt.
FuriousFox said:It's not a linedef type, you set Upper Unpegged (0x0008) on the linedef executor action you want to delay. Then, connect another sector to the backside of the linedef. The floor height + ceiling height of the back sector is how many tics the game will wait before performing the action.